The Hayward Lake Park circulation and traffic management design project in Mission, BC was completed under the guidance of [...]. The project focused on improving vehicle circulation, reducing congestion, and supporting safer traffic movement within the park. The main work included replacing an existing stop-controlled intersection with a compact single-lane roundabout and developing a recirculation lane to redirect vehicles before they enter the parking area when parking is full.
Contributors
Author: Baath, Sukhdip
Degree granting institution: British Columbia Institute of Technology
Contributor: Russell, Jacquie
Copyright Date
2026-04-17
Abstract
Subject (Topical)
Number of pages
33 pages
Type
Form
Language
Course
CIVL 4090
Rights
This license enables reusers to copy and distribute the material in any medium or format in unadapted form only, for noncommercial purposes only, and only so long as attribution is given to the creator. CC BY-NC-ND includes the following elements: BY: credit must be given to the creator. NC: Only noncommercial uses of the work are permitted. ND: No derivatives or adaptations of the work are permitted. https://creativecommons.org/licenses/by-nc-nd/4.0/