Skip to main content
Home
Institutional Repository

About

  • About

Breadcrumb

  1. Home
  2. Graduate Theses and Capstone Projects

Report No. CECDP - 2015/04 Design of a Pipeline Bridge in Northern BC

Contributors
Author: Cape, Myles
Author: Kim, Amos
Author: Lacson, Omnirey
Degree granting institution: British Columbia Institute of Technology
Copyright Date
2015-03
Abstract
Team Moja is pleased to provide you the Final Report on the Design of a Pipeline Bridge in Northern BC. This project was to design a 70 m aerial pipeline crossing over a creek within an active floodplain in Northern BC. The work consisted of the design of the superstructure and substructure to support the pipeline, a recommended construction plan, and an erosion protection plan. The final design is a modified Warren truss composed of a 40 m and 30 m span. The truss is made up of HSS rectangular and square sections with welded connections. Three concrete piers support the bridge superstructure with driven piles. The substructure is protected by launching riprap from the migrating watercourse. BMPs were implemented for the recommended construction plan to ensure the effects of work activities are minimized in the protection of fish and wildlife habitats. Parts: 81 pages (Design Report), 211 pages (Appendices), 7 pages (Appendix L), 2 pages (Appendix M), 2 pages (Cover - Design and Construction Package - Appendix).
Subject (Topical)
Pipeline crossings
Bridges
Structural design

Refine your search

  • Peer reviewed
  • Capstone project
Member of
Graduate Theses and Capstone Projects
Note

Capstone Design Project submitted in partial fulfillment of the requirement for the degree of Bachelor of Engineering (BEng) in Civil Engineering, British Columbia Institute of Technology, 2015.

Degree granted
Bachelor of Engineering (BEng) in Civil Engineering
Publisher
British Columbia Institute of Technology
Type
Text
Language
English
Rights

This license enables reusers to copy and distribute the material in any medium or format in unadapted form only, for noncommercial purposes only, and only so long as attribution is given to the creator. CC BY-NC-ND includes the following elements: BY: Credit must be given to the creator. NC: Only noncommercial uses of the work are permitted. ND: No derivatives or adaptations of the work are permitted. https://creativecommons.org/licenses/by-nc-nd/4.0/

Displaying 1 - 5 of 5

Results per page

  • 15
  • 60
  • 120
  •  List
  •  Grid
Displaying 1 - 5 of 5

Report No. CECDP - 2015/04 Design of a Pipeline Bridge in Northern BC - Appendices A-M

repository_299-Thumbnail Image.png

Report No. CECDP - 2015/04 Design of a Pipeline Bridge in Northern BC - Appendix L - Design Drawing Package

repository_301-Thumbnail Image.png

Report No. CECDP - 2015/04 Design of a Pipeline Bridge in Northern BC - Appendix M - Construction Drawing Package

repository_302-Thumbnail Image.png

Report No. CECDP - 2015/04 Design of a Pipeline Bridge in Northern BC - Cover - Design and Construction Package - Appendix

repository_300-Thumbnail Image.png

Report No. CECDP - 2015/04 Design of a Pipeline Bridge in Northern BC - Design Report

repository_298-Thumbnail Image.png
Display MODS Record
Display DC Record

Search within Collection

Resource Type

  • Text (5)

Creators and Contributors

  • British Columbia Institute of… (5)
  • Cape, Myles (5)
  • Kim, Amos (5)
  • Lacson, Omnirey (5)

Publisher

  • British Columbia Institute of… (5)

Physical Form

  • PDF (5)

Subject

Subject (name)

Temporal Subject

Year

  • 2015 (5)